FOSS

Type Date of Build FlagValue RegisterValue Port of Regestry
Gen. Cargo/Container Ship 1989-11-20 Cyprus LIMASSOL
IMO Number Official Number Call Sign
8713653 8713653 5BNK3
Legnth Breadth Gross tonnage Net tonnage Deadweight tonnage
101.7 17.03 4462 1510 3727

Back to List

FOSS Owner, Manager, Shipyard

Brodogradiliste Kraljevica d.d.

<p>Brodogradilište Kraljevica d.d. is a maritime shipyard located in Kraljevica, Croatia. This shipyard boasts a long and storied history, dating back to 1729, making it one of the oldest continuously operating

Maritime News

Norwind Offshore Takes Delivery of CSOV Newbuild from Vard

Norwind Offshore Takes Delivery of CSOV Newbuild from Vard

an hour ago
Norwind Offshore has taken delivery delivery of Norwind Maestro commissioning service operations vessel (CSOV) from Vard Søviknes, further expanding its managed fleet and reinforcing long-term commitment to supporting offshore wind farm operations.The 85-meter long Norwind Maestro CSOV has become the sixth vessel in Norwind Offshore’s fleet.The vessel, of VARD 4 19 design, will immediately start its 10-year contract at the Global Tech 1 Offshore Wind Farm in Germany, supporting operations and further strengthening the company’s long-standing partnership with Wind Multiplikator, a subsidiary of Semco Maritime.
OMS Group Enlists Ulstein to Build Two Next-Gen Cable Layers

OMS Group Enlists Ulstein to Build Two Next-Gen Cable Layers

2 days ago
Subsea services provider OMS Group has signed contracts with Ulstein for the design and construction of two cable laying vessels (CLVs).The vessels will be designed by Ulstein Design & Solutions and constructed at Ulstein Verft, with delivery planned for 2028. Each vessel will be about 130 meters long and 22 meters wide, with cable capacity of up to 6,500 tonnes and accommodation for 75 people.The design includes two large cable tanks, two spare-cable tanks, an enclosed cable deck hangar, and an open deck above the hangar for remotely operated vehicles and containers. The vessels will also be equipped with a 50-tonne A-frame and towing winch for cable ploughing operations.
Trafigura to Advance Low-Carbon Ammonia in U.S.

Trafigura to Advance Low-Carbon Ammonia in U.S.

2 days ago
CF Industries, Trafigura and TFG Marine have signed a memorandum of understanding (MoU) to facilitate the adoption of low-carbon ammonia as a marine fuel.Building on the successful collaboration between CF Industries and Trafigura in the shipment of low-carbon ammonia, the agreement establishes a framework for the parties to work together on advancing low-carbon ammonia as a marine fuel, supporting the global shipping industry's emissions-reduction efforts.Under the MOU, CF Industries, Trafigura and TFG Marine will collaborate on market development, stakeholder engagement and bunkering logistics planning. The collaboration will initially focus on the U.S. Gulf Coast and Northwest Europe.
Shipbuilding is Full Speed Ahead at RMC in Finland

Shipbuilding is Full Speed Ahead at RMC in Finland

5 days ago
For Rauma Marine Constructions (RMC), the year has had a strong start. Today, a significant milestone was reached in the Squadron 2020 project with the start of production of the fourth multi-purpose corvette and the keel-laying of the third one. This also means that all four multi-purpose corvettes of Pohjanmaa class -- ships that measure 117 x 16.5m with a 5m draft and a crew of 70 -- are now simultaneously under construction at the RMC shipyard. Moreover, preparations are in full swing for the production of the two icebreakers ordered by the United States at the end of 2025.The year 2026 is expected to be particularly interesting and significant for the Rauma shipyard.
Worley Joins Australia’s Westport Program as Marine Infrastructure Adviser

Worley Joins Australia’s Westport Program as Marine Infrastructure Adviser

an hour ago
Worley has been selected as Marine and Port Infrastructure Technical Advisor by the Government of Western Australia for the Westport Program, which aims to deliver a new container port in Kwinana.Under a joint venture with Arcadis, Worley will provide technical advisory and concept design services for marine and port infrastructure under an initial three-year agreement. Construction of the port is expected to begin in the late 2020s, with operations expected by 2040.Once completed, container trade from Fremantle Port will be relocated to the new precinct, integrating new port facilities, road and rail connections, an additional shipping channel and an offshore breakwater.