Maritime Vessels Directory

5025 - 5993(x) barge(x) (1-20 of 103) clear

Filters

Type
Flag
Port
Companies
Year
Gross Tonnage

ASIAN HERCULES

Barge | Flag: Republic of Singapore | Port: SINGAPORE

BOABARGE 21

Barge | Flag: Norway | Port: TRONDHEIM

BOABARGE 22

Barge | Flag: Norway | Port: TRONDHEIM

BREMEN

Barge | Flag: Germany | Port: HAMBURG

CB 123

Barge | Flag: Republic of Indonesia | Port: Banjarmasin

COLUMBIA NEW YORK

Barge | Flag: United States of America | Port: Portland, OR

DANUM 71

Barge | Flag: Malaysia | Port: KUCHING

DANUM 72

Barge | Flag: Malaysia | Port: KUCHING

LINAU 79

Barge | Flag: Malaysia | Port: KUCHING

MTR-1

Barge | Flag: Republic of Singapore | Port: SINGAPORE

PAMUKAN

Barge | Flag: Republic of Indonesia | Port: Jakarta

POLAR TRADER

Barge | Flag: United States of America | Port: SEATTLE, WA

SARI ANDALAS 6

Barge | Flag: Republic of Indonesia | Port: Jakarta

SM 365

Barge | Flag: Republic of Singapore | Port: SINGAPORE

STRALSUND

Barge | Flag: Germany | Port: HAMBURG

TERAS 3717

Barge | Flag: Republic of Singapore | Port: SINGAPORE

UR 111

Barge | Flag: Norway | Port: GRIMSTAD

UR 141

Barge | Flag: Norway | Port: GRIMSTAD

WISMAR

Barge | Flag: Germany | Port: HAMBURG

YAGANA

Barge | Flag: Republic of Panama | Port: PANAMA

Maritime News

Cadeler’s WTIV Newbuild En Route to Europe for Maiden Offshore Wind Job

Cadeler’s WTIV Newbuild En Route to Europe for Maiden Offshore Wind Job

9 hours ago
Hanwha Ocean has delivered the Wind Mover wind turbine installation vessel (WTIV) to offshore wind contractor Cadeler, completing the second vessel in the company’s M-class series about one month ahead of schedule.The vessel was formally signed over on November 28 and sailed away on December 2, following a naming ceremony at Hanwha Ocean’s shipyard in Korea.Wind Mover is the second of two WTIVs ordered by Cadeler in 2021, with the first vessel, Wind Maker, delivered in January 2025. One vessel will operate in Taiwanese waters while Wind Mover is scheduled to begin work in Europe.
New $60m U.S. Defense Shipbuilding Facility Set to Open in 2027

New $60m U.S. Defense Shipbuilding Facility Set to Open in 2027

2 days ago
Facility will include 150,000 square feet of covered manufacturing space optimized for serial productionNew yard will support 200 new jobs and expands shipbuilding capacity Master Boat Builders announced plans to build a new $60 million, 150,000 sq ft manufacturing facility dedicated exclusively to government and defense shipbuilding programs. The new 20-acre site is located directly across Bayou Coden from the company’s existing yard.“This new facility is about building more capability here at home,” said Garrett Rice, President, Master Boat Builders.
Hull Cleaning Robotics: Army Beats Navy – the Hegseth Way!

Hull Cleaning Robotics: Army Beats Navy – the Hegseth Way!

2 days ago
Sticking to legacy tactics won't beat China — adopt Secretary Hegseth's and the Army initiatives or surrender the edge.In a recent address, Admiral Christopher Grady, Vice Chairman of the Joint Chiefs of Staff, underscored the urgent need for a robotic hull-cleaning system to enable anytime maintenance, reduce drag, boost speed, and minimize fuel consumption for naval vessels. Hearing this, I immediately recognized an opportunity for the U.S. Army to step up and drive maritime innovation forward—at wartime speed. We transformed that vision into reality in record time, successfully demonstrating the technology on an Army Logistics Support Vessel (LSV) in Pearl Harbor last month.
Seatrium Launches Arbitration Against Maersk Over WTIV Contract Termination

Seatrium Launches Arbitration Against Maersk Over WTIV Contract Termination

3 days ago
Seatrium has issued a notice of arbitration against an affiliate of Maersk Offshore Wind, escalating a dispute over the termination of a contract for a wind turbine installation vessel (WTIV) intended for the Empire Wind 1 project in the United States.The move follows a notice of arbitration delivered by the buyer on October 21, one day after Seatrium notified the buyer that the vessel would be ready for delivery by January 30, 2026. The dispute will be heard in London under the current terms of the London Maritime Arbitrators Association (LMAA).
Protesters Disrupt Coal Shipment in Australia

Protesters Disrupt Coal Shipment in Australia

3 days ago
One of Australia's biggest coal export ports will resume operations on Monday, the port operator said, after climate-change protesters disrupted shipping at the Port of Newcastle for a second day on Sunday.Climate activist group Rising Tide, which claimed responsibility for the latest protest, said hundreds of activists paddled kayaks into the shipping lane of Newcastle Harbour on Sunday morning, violating an exclusion zone.The port, 170 km (110 miles) north of New South Wales state capital Sydney, is the largest bulk shipping port on the east coast of Australia, a nation where climate change is a divisive issue.
Maritime Reporter and Engineering News (November 2025)
Maritime Reporter and Engineering News (November 2025)