Maritime Vessels Directory

1311 - 1319(x) (1-20 of 23) clear

Filters

Type
Flag
Port
Companies
Year
Gross Tonnage

AL MOJIL 46

Offshore Supply Vessel | Flag: Kingdom of Saudi Arabia | Port: DAMMAM

ARABIAN SEA FOS

Supply Vessel/Tug | Flag: Panama | Port: PANAMA

AURIGA

Stern Trawler | Flag: United States | Port: ANACORTES, WA

AURORA

Stern Trawler | Flag: United States | Port: ANACORTES, WA

BARTLETT

Tender | Flag: Canada | Port: OTTAWA, ON

CORAL SEA FOS

Supply Vessel/Tug | Flag: Panama | Port: PANAMA

CT.CO. 2404

Tank Barge | Flag: United States of America | Port: NEW ORLEANS, LA

HUAHAI

Supply Vessel/Tug | Flag: Liberia | Port: MONROVIA

HUAYANG

Supply Vessel/Tug | Flag: Liberia | Port: MONROVIA

HUAYUAN

Supply Vessel/Tug | Flag: Liberia | Port: MONROVIA

INTER SERVICE

Supply Vessel | Flag: Panama | Port: PANAMA

JOHN W. JOHNSON

Ferry | Flag: United States of America | Port: Galveston, TX

NDC 600

Barge | Flag: United States of America | Port: NEW ORLEANS, LA

OCEAN CAIRO

Offshore Supply Vessel | Flag: Arab Republic of Egypt | Port: PORT SAID

OCEAN RESCUER

Supply Vessel/Tug | Flag: Panama | Port: PANAMA

OCEAN SKY

Supply Vessel/Tug | Flag: Norway | Port: BERGEN

RED SEA FOS

Supply Vessel/Tug | Flag: Panama | Port: PANAMA

SEACOR PRIDE

Offshore Supply Vessel | Flag: Mexico | Port: DOS BOCAS

TEMASEK ATTAKA

Supply Vessel/Tug | Flag: Indonesia | Port: Jakarta

VONAR

Fishing | Flag: Norway | Port: ÅLESUND

  • 1
  • 2

Maritime News

Cadeler’s WTIV Newbuild En Route to Europe for Maiden Offshore Wind Job

Cadeler’s WTIV Newbuild En Route to Europe for Maiden Offshore Wind Job

15 hours ago
Hanwha Ocean has delivered the Wind Mover wind turbine installation vessel (WTIV) to offshore wind contractor Cadeler, completing the second vessel in the company’s M-class series about one month ahead of schedule.The vessel was formally signed over on November 28 and sailed away on December 2, following a naming ceremony at Hanwha Ocean’s shipyard in Korea.Wind Mover is the second of two WTIVs ordered by Cadeler in 2021, with the first vessel, Wind Maker, delivered in January 2025. One vessel will operate in Taiwanese waters while Wind Mover is scheduled to begin work in Europe.
New $60m U.S. Defense Shipbuilding Facility Set to Open in 2027

New $60m U.S. Defense Shipbuilding Facility Set to Open in 2027

2 days ago
Facility will include 150,000 square feet of covered manufacturing space optimized for serial productionNew yard will support 200 new jobs and expands shipbuilding capacity Master Boat Builders announced plans to build a new $60 million, 150,000 sq ft manufacturing facility dedicated exclusively to government and defense shipbuilding programs. The new 20-acre site is located directly across Bayou Coden from the company’s existing yard.“This new facility is about building more capability here at home,” said Garrett Rice, President, Master Boat Builders.
Hull Cleaning Robotics: Army Beats Navy – the Hegseth Way!

Hull Cleaning Robotics: Army Beats Navy – the Hegseth Way!

2 days ago
Sticking to legacy tactics won't beat China — adopt Secretary Hegseth's and the Army initiatives or surrender the edge.In a recent address, Admiral Christopher Grady, Vice Chairman of the Joint Chiefs of Staff, underscored the urgent need for a robotic hull-cleaning system to enable anytime maintenance, reduce drag, boost speed, and minimize fuel consumption for naval vessels. Hearing this, I immediately recognized an opportunity for the U.S. Army to step up and drive maritime innovation forward—at wartime speed. We transformed that vision into reality in record time, successfully demonstrating the technology on an Army Logistics Support Vessel (LSV) in Pearl Harbor last month.
Seatrium Launches Arbitration Against Maersk Over WTIV Contract Termination

Seatrium Launches Arbitration Against Maersk Over WTIV Contract Termination

3 days ago
Seatrium has issued a notice of arbitration against an affiliate of Maersk Offshore Wind, escalating a dispute over the termination of a contract for a wind turbine installation vessel (WTIV) intended for the Empire Wind 1 project in the United States.The move follows a notice of arbitration delivered by the buyer on October 21, one day after Seatrium notified the buyer that the vessel would be ready for delivery by January 30, 2026. The dispute will be heard in London under the current terms of the London Maritime Arbitrators Association (LMAA).
Protesters Disrupt Coal Shipment in Australia

Protesters Disrupt Coal Shipment in Australia

4 days ago
One of Australia's biggest coal export ports will resume operations on Monday, the port operator said, after climate-change protesters disrupted shipping at the Port of Newcastle for a second day on Sunday.Climate activist group Rising Tide, which claimed responsibility for the latest protest, said hundreds of activists paddled kayaks into the shipping lane of Newcastle Harbour on Sunday morning, violating an exclusion zone.The port, 170 km (110 miles) north of New South Wales state capital Sydney, is the largest bulk shipping port on the east coast of Australia, a nation where climate change is a divisive issue.
Maritime Reporter and Engineering News (November 2025)
Maritime Reporter and Engineering News (November 2025)