Anne Arundel County Emergency Management Bureau

Anne Arundel County Emergency Management Bureau, located in Maryland, is a governmental agency responsible for coordinating the response to natural and man-made disasters within Anne Arundel County. The bureau plays a crucial role in planning, preparing, and mitigating potential emergency situations to protect the lives and property of county residents.

Key functions of the Emergency Management Bureau typically include:

  1. Emergency Planning: Developing comprehensive emergency plans that cover various potential scenarios such as hurricanes, floods, hazardous materials incidents, and terrorist attacks.
  2. Preparedness Programs: Conducting community outreach and education to ensure that residents and businesses are prepared for emergencies. This includes public information campaigns, drills, and training programs.
  3. Response Coordination: Serving as the central coordination point for emergency response. This involves working closely with local, state, and federal agencies, as well as non-governmental organizations.
  4. Recovery Efforts: Assisting with recovery efforts post-disaster, including coordinating resources and services to help communities rebuild and recover.
  5. Mitigation Initiatives: Identifying and implementing strategies to reduce the long-term risk to life and property from future disasters. This may involve infrastructure projects, policy changes, and other risk-reduction measures.

The bureau operates an Emergency Operations Center (EOC) that becomes fully activated during significant emergencies to manage incident response and support field operations. The staff typically includes specialists in areas like public information, logistics, planning, operations, and finance/administration.

Ultimately, the goal of the Anne Arundel County Emergency Management Bureau is to enhance the safety and resilience of the community through effective disaster planning, response, and recovery operations. For the most accurate and up-to-date information, it's advisable to check their official website or contact them directly.

Products

Local Government Emergency Response

Millersville USA

8501 Veterans Highway
Millersville MD 21108
USA

Ships

CLEVELAND ROCKS

Barge | Flag: United States of America | Port: Cleveland, OH

Maritime News

Talking Marine Vessel Coatings with Christer Øpstad, Jotun

Talking Marine Vessel Coatings with Christer Øpstad, Jotun

14 hours ago
Sourcing and maintaining marine coatings systems are arguably a shipowner’s most critical means to ensure a long and productive lifecycle for ships, boats and offshore rigs. At the same time, coatings have become a central part of the ship efficiency, decarbonization discussion. Christer Øpstad, Global R&D Director Fouling Protection, Jotun, discusses how these macro trends are driving R&D within his laboratories today.To start us off, can you provide a ‘by the numbers’ look at Jotun today?Jotun is headquartered in Sandefjord, Norway, still a family-owned company founded almost 100 years ago.
First US-Built Wind Turbine Installation Vessel Starts Sea Trials

First US-Built Wind Turbine Installation Vessel Starts Sea Trials

2 days ago
The United States' first Jones Act-compliant offshore wind turbine installation vessel (WTIV), Charybdis, has started sea trials ahead of delivery to Dominion Energy planned for later in 2025.The Seatrium AmFELS shipyard in Bronsville, Texas, has been in charge of the construction of the WTIV vessel, the first of its kind to be build in the United States.The vessel, commissioned by Dominion Energy, also recently completed the jacking trial and main crane load testing, Seatrium informed, adding the Charybdis is 96% completed.The vessel complies with U.S. Jones Act regulations, which means it is allowed to operate in U.S. waters for domestic offshore wind projects.
Louis Dreyfus Picks Chinese Shipyard to Build Three New SOVs for Vattenfall

Louis Dreyfus Picks Chinese Shipyard to Build Three New SOVs for Vattenfall

2 days ago
French ship owner Louis Dreyfus Armateurs (LDA) has selected SALT as the naval architect and Shanghai Zhenhua Heavy Industries Company (ZPMC) as the shipyard for the construction of three new service operation vessels (SOVs) ordered by Vattenfall.SALT, an offshore vessel designer and long-time partner of LDA, has been entrusted with the development of the new SOVs.ZPMC has been chosen as the shipyard for the construction of the new SOVs.The new SOVs will integrate high-end European components, including the gangway system, the DP system and key propulsion line systems, ensuring tier I performance and reliability.
Greek Shipyards Revitalized

Greek Shipyards Revitalized

3 days ago
The rhythmic clang of hammers and the bright flashes of welding torches filled the air at Skaramangas Shipyard near Athens last month, as workers busily repaired the bow of a large tanker. Nearby, other vessels awaited their turn in the dry dock—an unmistakable sign of renewed activity at the once-idle shipyard.Just a year ago, Skaramangas stood empty, a stark reminder of Greece’s prolonged debt crisis from 2009 to 2018. Following decades of inconsistent government ownership and uncertainty, the shipyard had languished. But today, it is experiencing a revival.“Now there is life here again,” said Theodoros Evagelou, a worker sandblasting and painting ships.
Evergreen Places $3.2B Order for 11 LNG Dual-Fuel Container Ships

Evergreen Places $3.2B Order for 11 LNG Dual-Fuel Container Ships

3 days ago
Taiwanese container shipping firm Evergreen Marine Corporation has ordered 11 new LNG dual-fuel container ships from South Korean and Chinese shipyards, whose combined worth is up to $3.2 billion.On February 12, Evergreen disclosed two orders for 11 container ships, each with a 24,000 TEU capacity.The company placed an order to South Korea’s Hanwha Ocean for six vessels, and to CSSC Guangzhou Shipyard International (GSI) in China for the remaining five vessels.Evergreen will pay between $265 million and $295 million per unit, totaling up to approximately $1.77 billion for six vessels to be built at Hanwha Ocean and around $1.47 billion for five containerships at GSI.